The generator will now supply the electricity to your building.
When the mains is restored, the supply monitoring relay senses this and switches the generator supply off whilst simultaneously switching the mains supply on.
The generator will continue to run for a preset time period known as the cool down period and then the whole system waits for the next mains failure.
To prevent the generator starting when the mains is interrupted for small time intervals e.g. 2 seconds, time delay relays are built into the ATS to prevent a remote start signal being sent to the generator. Similar relays are also supplied to prevent the reverse happening i.e. the generator stopping and transferring load to the mains when the mains is only restored temporarily.
FW Power – The Home of Diesel Generators.
|